header image

Welcome to ZOZEN

ZOZEN is one of the best modern boiler manufacturers in China, our products include steam boilers, hot water boilers and thermal oil heaters. ZOZEN boiler is located in Wuxi, covers 150 thousand square meters of production area, equipped with first-class production equipment, passed the ISO9001:2000 international quality system certification. The company gained the " S " and " U " steel seal from ASME of US.

Customer service

If you run into any problems with the boiler, please contact us directly by email or fill out the online service request. We will do our best to resolve any problems you might have within 24 hours.

In case of special condition, ZOZEN will forward your request to one of its partnered sales representatives depending on the country and state. The local maintenance personnel will arrive at the customer site as soon as possible.


Heat Recovery Steam Syste

heat recovery steam systems Selecting the appropriate "heat recovery steam generator" (HRSG) for cogeneration (CHP) and fume incineration systems involves much consideration. Important areas of concern are controlling/bypassing the waste heat, optimizing overall system performance, maintaining required operating pressures, boiler size, weight

xuyi@zozen.com >

Get A Quote >

PERANCANGAN HEAT RECOVERY BOILER BLOWDOW

2017-6-12 · TUGAS AKHIR – TM 091486 PERANCANGAN HEAT RECOVERY BOILER BLOWDOWN DI PT NESTLE INDONESIA KEJAYAN FACTORY Awan Wahyu Prakosa NRP 2110 106 027 Dosen Pembimbing Dr. Wawan Aries Widodo, ST., MT. NIP.

xuyi@zozen.com >

Get A Quote >

Boiler Blowdown Heat Recovery - michaelsenergy.c

Boiler blowdown heat recovery can take many forms depending on your specific boiler plant. The simplest and least expensive option is a single heat exchanger that all of the blowdown is run through to preheat the incoming make-up water. More complicated systems can include flash tanks or heated water storage tanks, depending on the facility

xuyi@zozen.com >

Get A Quote >

Continuous Blowdown Heat Recovery – Kansas Cit

Cooled Blowdown to drain (100-110°). Boiler Make-Up exits heated by continuous blowdown at no extra cost. Cold Water boiler make-up enters system. Sludge Area no pockets or baffles in heat exchanger area for sludge to deposit and reduce heat recovery efficiency or to clop the flow area. Spiral Coil Heat Exchanger designed to provide maximum

xuyi@zozen.com >

Get A Quote >

Boiler - Wikiped

18  · Automatic blowdown/continuous heat recovery system: This system allows the boiler to blowdown only when makeup water is flowing to the boiler, thereby transferring the maximum amount of heat possible from the blowdown to the makeup water. No flash tank is generally needed as the blowdown discharged is close to the temperature of the makeup water.

xuyi@zozen.com >

Get A Quote >

Heat recovery - carbontrust.c

Heat recovery is a method of reducing the overall energy consumption of your site and therefore reducing the running costs. Recovered heat can help you reduce energy consumption or provide useful heat for other purposes. Definition of heat recovery Heat recovery in the context of buildings and their services can be defined as the collection

xuyi@zozen.com >

Get A Quote >

Selection of Blowdown Systems - Industrial ste

2019-10-10 · Operation of Continuous Blowdown Heat Recovery – The blowdown heat recovery system operates at the deaerator pressure. the surface blowdown water enters the flash tank. The water temperature is reduced to 227oF (5 psig) and it falls to the storage tank. The flash steam is vented to the deaerator to be used to heat the boiler feedwater.

xuyi@zozen.com >

Get A Quote >

Blowdown Heat Recovery | Combustion Service &

Complete package skid mounted on a channel frame. Total heat recovery from continuous blowdown is over 95% for the crossover system. WILSON ENGINEERING – Wilson Engineering's CBHR is a low cost continuous blowdown heat recovery system that saves enough energy to pay for itself in just a few months. Flash is directed to the deaerator

xuyi@zozen.com >

Get A Quote >

Bottom Blowdown - beta.spiraxsarco.c

The piping arrangement for multi-boiler installations is covered in the UK HSE Guidance Note (PM60); the following points are made: Operation. Only one boiler can be blown down at any one time. In fact, sizing of the blowdown vessel will be based on the highest pressure boiler with the biggest blowdown line size.

xuyi@zozen.com >

Get A Quote >

CONTINUOUS BLOWDOWN HEAT RECOVERY SYST

2013-6-17 · The Stickle Steam Specialties Series 550 Continuous Blowdown Heat Recovery System is offered in a wide range of flow rates, boiler pressure, and blowdown tank operating pressures. From top to bottom each Stickle Series 550 Continuous Blowdown Heat Recovery System is individually designed to meet your specific conditions.

xuyi@zozen.com >

Get A Quote >

Boiler Blowdown Separators | Hurst Boiler, In

BOILER BLOWDOWN SEPARATORS SAFELY SEPERATES STEAM VAPOR FROM BOILER BLOW-OFF WATER The Hurst Boiler Company (HBC) Blowdown Separator is designed to take water from the boiler during blowdown and reduce it to atmospheric pressure for disposal.

xuyi@zozen.com >

Get A Quote >